top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

NCSU NWK Lab

Project type

Lab

Date

June 2025

Location

Raleigh NC

The old networking lab (previously in EBII 2027) has not been utilized by students since COVID. Moving into a new loation (now in EBII 1020), Professor Viniotis wanted to move students back to physical lab environment from simulation (e.g., packet tracer) and virtualized setup (e.g., Containerlab).

This requires the racking, configuration, setup, and verification of the following devices
- 36 Cisco C9300 switches
- 24 Cisco N9K switches
- 12 Cisco 8200 routers
- 12 Arista 7050 switches
- Several other Arista switches
- 6 Racks
- 24 Raspberry Pi hosts, 6 KVM switches

bottom of page